Toshiba Plant Systems and Services Corp. (TPSC) landed a contract to construct a 150-megawatt coal-fired power plant in Preah Sihanouk province, which would be Cambodia’s third coal-fired power plant. TPSC will build the turnkey power plant for Cambodian Energy II Co. Ltd. (CEL2). Construction should be completed by late 2019.

Share